Rockwool Project

This project a little different then most, had 3 layers of R14 Rock wool batts in the exterior walls adding up to a R42. The vaulted ceiling consists of multiple layers of Rock wool batts adding up to R80. The rest of the attic was topped off also to R80 will Fiberglass loose fill insulation.

02

Fiberglass project

This project had R22 batts in the exterior walls, R50 combined batts in the vaulted ceiling and R60 in the rest of the attic.

Image 22.jpeg
Image 23.jpeg
20221114_120740.jpg

03

Attic Top Off

In this attic top off there was very little existing insulation and no soffit ventilation. To fix the ventilation we drilled holes in the soffit and added a grilled vents, opening up air flow to the attic. In the attic we added rafter mates to keep a gap for the airflow. Then we added 16 inches of fibreglass loose fill insulation. 

04

Removal rodent Damage

On this project we came in knowing there was some rodent issues. After removing the drywall and old insulation, we repaired and plugged the holes being used by the rodents. The walls then got R14 Batts (for 2x4 wall) new vapor barrier and some new drywall.